kids encyclopedia robot

Merritt Parkway facts for kids

Kids Encyclopedia Facts
Quick facts for kids

[[File:|x70px|alt= marker]]

Merritt Parkway highlighted in red
Route information
Length 37.67 mi (60.62 km)
Existed 1938–present
Tourist
routes
A Map of the Merritt Parkway Merritt Parkway
Restrictions No trucks, buses, trailers, towed vehicles, or vehicles taller than 8 ft (2.4 m)
Major junctions
South end Hutchinson River Parkway at the New York state line in Greenwich
 
North end Route 15 / Wilbur Cross Parkway / Milford Parkway in Milford
Location
Counties: Fairfield, New Haven
Highway system
Routes in Connecticut
Special Service Roads • State Roads
Merritt Parkway
Architect Connecticut Highway Department; et al.
Architectural style Colonial Revival, Classical Revival, Modern Movement
NRHP reference No. 91000410
Added to NRHP April 17, 1991


The Merritt Parkway (also known locally as "The Merritt") is a limited-access parkway in Fairfield County, Connecticut, with a small section near the northern end in New Haven County. Designed for Connecticut's Gold Coast, the parkway is known for its scenic layout, its uniquely styled signage, and the architecturally elaborate overpasses along the route. As one of the first, oldest parkways in the United States, it is designated as a National Scenic Byway and is also listed in the National Register of Historic Places. Signed as part of Route 15, it runs from the New York state line in Greenwich, where it serves as the continuation of the Hutchinson River Parkway, to Exit 54 in Milford, where the Wilbur Cross Parkway begins. Facing bitter opposition, the project took six years to build in three different sections, with the Connecticut Department of Transportation constantly requiring additional funding due to the area's high property value. The parkway was named for U.S. Congressman Schuyler Merritt. In 2010, the National Trust for Historic Preservation called the Merritt Parkway one of "America's 11 Most Endangered Historic Places".

Trucks, buses, trailers, towed vehicles, and all vehicles 8 feet (2.4 m) tall or taller are not allowed on any part of the parkway due to its low bridges, narrow lanes, and tight curve radii.

Route description

Bridge MerrittPkwy
Easton Turnpike bridge over the Merritt Parkway in Fairfield.

The Merritt is one of a handful of United States highways listed in the National Register of Historic Places. It is acknowledged for the beauty of the forest through which it passes, as well as the architectural design of its overpasses; at the time of its construction, each bridge was decorated in a unique fashion so that no two bridges on the parkway looked alike. Newer overpasses used at exit 39 (US 7), though, did not maintain this tradition, and as a result, exit 39 on the parkway is now spanned by several ordinary modern bridges constructed using undecorated concrete-on-steel I-beams.

The parkway has two lanes in each direction. Due to its age, it was originally constructed without the merge lanes, long on-ramps, and long off-ramps that are found on modern limited-access highways. Some entrances have perilously short and/or sharp ramps; some entrances even have stop signs, with no merge lane whatsoever; this leads to some dangerous entrances onto the highway. Most have since been modernized, with the interchange of Route 111 in Trumbull featuring Connecticut's first single-point urban interchange (SPUI). The speed limit on the parkway ranges from 45 to 55 mph (70 to 90 km/h). The stretch of road between exit 42 in Westport and exit 44 in Fairfield is a very long stretch, roughly 5+12 miles (8.9 km) long without a single exit, referred to by local traffic reports as the "No Exit Zone" or "No Man's Land". An exit 43 was planned in the middle of this stretch, but was never built because it would have connected to a northerly extension of the Sherwood Island Connector, which itself was never built to that point.

Vehicles 8 feet (2.4 m) tall or taller in height, weighing 8,000 pounds (3,600 kg) or more, towing a trailer, or having more than four wheels are not allowed on the parkway. Under extenuating circumstances, however, ConnDOT may issue permits for oversized vehicles to use the parkway.

History

Merritt3
Tree canopy over the Merritt, and grassy median
15 ent
An entrance sign to the Merrit Parkway with the white-on-green and sawtooth border

The Merritt Parkway is one of the oldest scenic parkways in the United States. The portion from Greenwich to Norwalk was opened on June 29, 1938. The section from Norwalk to Trumbull was completed in November 1939, and in 1940, it was finished to the Housatonic River in Stratford. The parkway was named for U.S. Congressman Schuyler Merritt, who was instrumental in enacting legislation allowing the parkway to be built. The Merritt Parkway is the first leg of what later became modern Route 15. Built between 1934 and 1940, the Merritt runs for 37 miles (60 km) from the New York state line in Greenwich to the Housatonic River in Stratford. It was conceived as a way to alleviate congestion on the Boston Post Road (U.S. Route 1) in Fairfield County.

After the parkway fully opened in 1940, travelers not uncommonly stopped to picnic along the side of the road. The Merritt Parkway Advisory Commission (later the Merritt Parkway Advisory Committee) decided to ban horses and buggies, bicycles, pedestrians, billboards, and U-turns, while a system of horse trails along the parkway was developed, but later abandoned.

To ease objections from county residents, who feared an influx of New Yorkers on their roads, in their towns, on their beaches, and through their forests, highway planners called on engineers, landscape architects, and architects to create a safe and aesthetically pleasing limited-access highway, one with exit and entrance ramps, but no intersections, that would not spoil the countryside.

The bridges played a prominent role in the design. Architect George L. Dunkelberger designed them all. They reflected the popularity of the Art Deco style, with touches of neoclassical and modern design. Some of these bridges were constructed by the Works Progress Administration.

MerrittToll1955
Toll booth in 1955

Tolls were collected on the parkway at one toll plaza in Greenwich from June 21, 1939, until June 27, 1988. Two additional tolls were also located on the Wilbur Cross Parkway, in Milford and Wallingford. One of the parkway's former toll plazas is now preserved in Stratford's Boothe Memorial Park near Exit 53, complete with still-flashing lights over each toll lane.

In April 2001, a complete reissuance of the parkway's signs was carried out, instituting a uniform white-on-green color scheme, and a sawtooth border.

Services

Six rest areas/service plazas, featuring parking lots, gas stations, and convenience stores, were also built along the Merritt so that drivers would not have to exit to refuel. Pairs of plazas are located opposite each other on either side of the parkway in Fairfield (near exit 46), New Canaan (near exit 37), and Greenwich (just beyond the CT-NY state line). The northbound-side plaza in Greenwich also houses a Connecticut welcome center. The plazas were originally constructed during the parkway's days as a tolled highway, but remained even after the tolls were removed in 1988, making the parkway one of only a few toll-free highways with service plazas along its length. Between 2011 and 2015, all six of the service plazas (along with the four located further north along the Wilbur Cross Parkway) were completely renovated. The renovations preserved the original brick-and-stone façade of the buildings, but completely redesigned and modernized the interiors. The plazas now include more modern gas pumps, Alltown convenience stores, and a Dunkin' Donuts shop at each location; three of the Merritt's six plazas also include a Subway shop. Prior to the renovations, no fast-food service had previously been available at the plazas. The renovation project was completed during the summer of 2015, when the New Canaan plazas were reopened.

In 2013, electric-vehicle (EV) charging stations for Tesla automobiles were added to both the northbound and southbound Greenwich service plazas, with four Superchargers installed in each direction. In addition, charging for CHAdeMO-equipped EVs was added to the northbound Greenwich service plaza. The parking/charging stalls are some of the first in the U.S. to be designated "shared use" - EVs may use the stall for up to 45 minutes to charge, or internal-combustion engine

Safety

Entering the Merritt Parkway in Greenwich
Welcome sign on the northbound side in Greenwich near exit 27 on the NY-CT state border.

One of the Merritt's aesthetic features is also a potential danger to its drivers. Trees that line either side of the parkway, and often in the center median, grow branches that cover the roadway, and occasionally fall during severe weather, or with natural aging. Stretches of the parkway also lack guardrails on the right shoulders, creating a risk of tree-impact accidents if cars veer off the pavement.

In 2007, after complaints were voiced about the danger of the trees along the parkway, state officials announced they would trim and eliminate some of them more aggressively. A large, seemingly healthy tree fell on a car near exit 42 in Westport in June 2007, killing a couple from Pelham, New York. On June 23, 2011, a driver was killed in Stamford when a tree fell onto his car.

A state study of fatalities on Connecticut highways showed that from 1985 to 1992, about 10 people died every three years in tree-related accidents, although no other state roadway averaged more than one in three years.

The state Department of Transportation commonly sends out work crews twice a year to drive along both sides of the parkway at 5 miles per hour (8.0 km/h) in search of decrepit trees. Trees that had been scheduled to be cut down in five to 10 years would be removed sooner. Some more trees also would be removed, as the shoulder of the parkway is being widened to 8 feet (2.4 m) to give drivers room to pull over.

Following the 2007 and 2011 incidents, the state became more aggressive in closing the parkway in times of severe weather. The parkway was closed during Tropical Storm Irene and the Halloween nor'easter in 2011, and Hurricane Sandy in 2012. With each of those storms, many trees and limbs fell across the parkway. After Sandy, the state began a large effort to remove unhealthy trees, and in the process created much wider clearances between the roadside and forest.

The parkway also has three sharp curves where speed limits are reduced to 45 miles per hour (72 km/h), two in Greenwich and one in Fairfield.

The Merritt Parkway Advisory Committee meets quarterly.

Future

ConnDOT is currently reviewing plans and holding community meetings over a redesign of the Merritt's interchange with U.S. Route 7 (US 7) and Main Avenue in Norwalk, exits 39 and 40. The US 7 freeway was extended north to Wilton from its previous terminus in the northern part of Norwalk in 1992, passing the Merritt along the way. Due to a lack of funds, a full interchange was not built between the Merritt and US 7, which led to the lack of the important southbound Merritt to southbound US 7 connection. Not long after, ConnDOT and the federal government drew up plans for a three-level interchange that provided all connections between Main Avenue, the Merritt, and US 7. Work was supposed to begin on the Main Avenue portion in 2005 and on the US 7 and Merritt portion in 2007, but local activists filed and won a lawsuit in 2006 against ConnDOT and the federal government, alleging that not only was the proposal too expensive, but also the plans were rushed and did not take into account the beauty and historical significance of the parkway. Similar lawsuits were brought on earlier during the construction of the interchanges at Route 8 and Route 25, but both failed. The lawsuit specifically mentioned the flyover ramps between the Merritt and US 7 as a significant issue. ConnDOT and the federal government were forced to redesign their plans, with hopes of construction starting in 2009. Plans soon fell apart, and ConnDOT was forced to temporarily drop the issue. Community outreach started back up in 2017, and ConnDOT is actively drawing up plans as of May 2019 with hopes of starting construction sometime between 2021 and 2024.

Exit list

Like most highways in Connecticut, exits are numbered sequentially, not mile-based, though the state is gradually transitioning to milepost-based exit numbers. Exit numbers on the Merritt continue with those of the Hutchinson River Parkway, which formerly ended at 27. More interchanges were since added in New York, so King Street (NY 120A), which travels along the state border, is served by exit 27 on the Merritt and exit 30 on "the Hutch".

County Location Mile Roads intersected Notes
Fairfield Greenwich 0.00 0.00 Hutchinson River Parkway south – New York City Continuation into New York; exit numbers continue south along Hutchinson Parkway
0.05 0.080 27 NY 120A north (King Street) – Armonk, NY Access to NY 120A south via Hutchinson Parkway exit 30S
3.39 5.46 28 Round Hill Road To Greenwich Business District
4.16 6.69 29 Lake Avenue
5.71 9.19 31 North Street To Greenwich Business District
Stamford 8.89 14.31 33 Den Road Right-in/right-out interchange
9.22 14.84 34 Route 104 (Long Ridge Road) To Downtown Stamford and University of Connecticut Stamford Campus
10.40 16.74 35 Route 137 (High Ridge Road)
New Canaan 13.15 21.16 36 Route 106 (Old Stamford Road)
13.89–
14.10
22.35–
22.69
37 Route 124 – New Canaan, Darien
Norwalk 16.01 25.77 38 Route 123 (New Canaan Avenue) To Norwalk Community College
16.87–
17.31
27.15–
27.86
39 US 7 – Norwalk, Danbury Northbound exit and southbound entrance; signed as exits 39A (south) and 39B (north); redesign in proposal stage
17.53–
17.63
28.21–
28.37
40 Main Avenue to US 7 – Norwalk, Danbury Signed as exits 40A (south) and 40B (north); no northbound signage for US 7
Westport 20.73 33.36 41 Route 33 – Westport, Wilton
21.59 34.75 42 Route 57 – Westport, Weston
Fairfield 26.95 43.37 44 Route 58 – Fairfield, Redding To Fairfield Business District and Fairfield University
28.58 46.00 46 Route 59 – Fairfield, Easton To West Campus of Sacred Heart University, formerly General Electric Headquarters
Trumbull 29.31 47.17 47 Park Avenue To University of Bridgeport and Sacred Heart University
30.37 48.88 48 Route 111 (Main Street) – Long Hill, Monroe Single-point urban interchange
31.64 50.92 49S Route 25 south to Route 8 south – Bridgeport Southbound access to Route 25 south via exit 52; exit 7A on Route 25 north
32.69 52.61 49
49N
Route 25 north – Danbury Signed as exit 49 southbound, exit 49N northbound; exits 8A & B on Route 25 south
32.99 53.09 50 Route 127 – Trumbull Southbound exit and northbound entrance
33.51 53.93 51 Route 108 (Nichols Avenue) – Trumbull, Stratford Northbound exit and southbound entrance
33.77–
34.57
54.35–
55.64
52 Route 8 to Route 108 – Bridgeport, Waterbury Northbound access to Route 8 south via exit 49S; exits 9-10 on Route 8
Stratford 36.54 58.81 53 Route 110 – Stratford, Shelton
Housatonic River 37.53 60.40 Igor I. Sikorsky Memorial Bridge
New Haven Milford 37.67 60.62 54 To I-95 / US 1 – Milford, New London Access via Milford Parkway
Route 15 north (Wilbur Cross Parkway) – Hartford Continues north as the Wilbur Cross Parkway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

=Images for kids

kids search engine
Merritt Parkway Facts for Kids. Kiddle Encyclopedia.