Humber Bridge facts for kids

Kids Encyclopedia Facts
Quick facts for kids
Humber Bridge
Humber Bridge2.png
The Humber Bridge, Lincolnshire/East Yorkshire
Coordinates 53°42′23″N 0°27′01″W / 53.7064°N 0.4502°W / 53.7064; -0.4502
Carries 4 lanes of motor traffic (A15), pedestrian- cycle-way either side
Crosses Humber
Locale Hessle, East Riding of Yorkshire/North Lincolnshire
Maintained by The Humber Bridge Board
Heritage status Grade I listed
Characteristics
Design Suspension
Total length 2,220 m (7,280 ft; 1.38 mi)
Width 28.5 m (94 ft)
Height 155.5 m (510 ft)
Longest span 1,410 m (4,630 ft; 0.88 mi)
History
Construction cost £98,000,000
£151,000,000 including interest at completion
Opened To traffic on 24 June 1981
Officially on 17 July 1981
Statistics
Daily traffic 120,000 vehicles per week
Toll
Toll/Humbertag discount
  • Motorcycle (+sidecar): £0.00
  • up to 3.5t, caravans/motorhomes, cars with trailers: £1.50/1.35
  • 2 axle vehicles, 3.5–7.5 t, 9–16 passenger minibus, bus/coaches, agricultural vehicles: £4:00/3.60
  • min 3 axles and over 7.5t: £12.00/10.80
Lua error in Module:Location_map at line 420: attempt to index field 'wikibase' (a nil value).

The Humber Bridge, near Kingston upon Hull, East Riding of Yorkshire, England, is a 2.22 km (2,430 yd; 7,300 ft; 1.38 mi) single-span road suspension bridge, which opened to traffic on 24 June 1981. When it opened, the bridge was the longest of its type in the world; it was not surpassed until 1998, with the completion of the Akashi Kaikyō Bridge, and is now the eleventh-longest.

The bridge spans the Humber (an estuary formed by the rivers Trent and Ouse), between Barton-upon-Humber on the south bank and Hessle on the north bank, connecting the East Riding of Yorkshire with North Lincolnshire. Both sides of the bridge were in the non-metropolitan county of Humberside until its dissolution in 1996. The bridge can be seen for miles around and from as far as Patrington in the East Riding of Yorkshire and out to sea miles off the coast. It is a Grade I listed building.

By 2006, the bridge carried an average of 120,000 vehicles per week. The toll was £3.00 each way for cars (higher for commercial vehicles), which made it the most expensive toll crossing in the United Kingdom. In April 2012, the toll was halved to £1.50 each way after the UK government deferred £150 million from the bridge's outstanding debt.

History

Before the bridge, commuters crossed the Humber on the Humber Ferry from Corporation Pier at Hull and New Holland Pier at New Holland, Lincolnshire or by road via the M62 (from 1976), M18 (from 1979) and M180 motorways, crossing the River Ouse near Goole (connected to the Humber). Until the mid-1970s, the route south was via the single-carriageway A63 and the A614 (via grid-locked Thorne where it met the busy A18 and crossed the Stainforth and Keadby Canal at a swing bridge bottleneck and on through Finningley and Bawtry, meeting the east–west A631).

The journey was along straight single-carriageway roads across foggy moors interrupted by bottlenecks for most of the journey to Blyth, Nottinghamshire, where it met the A1, and the accident rate was high. Debates in Parliament were held on the low standard of the route across the wind-swept plains around Goole. It was not unexpected that under these conditions, a Humber Bridge, with connecting dual-carriageway approach roads and grade-separated junctions, would seem worthwhile. By the time the bridge opened, much of this inferior route had been transformed by dualling of the A63 and its bypasses, extending the M62 and the connecting of the M18 from Thorne to Wadworth. The obvious need for a Humber Bridge had been reduced by the late 1970s with the improvements of the motorway infrastructure in the region. Although welcome, these improvements detracted from the need for vehicles to cross a bridge from Hessle to Barton. The Humber Bridge was a victim of the success of the M62 before it opened. A hovercraft service, Minerva and Mercury, linked Hull Pier and Grimsby Docks from February to October 1969 but suffered relatively frequent breakdowns.

Act of Parliament

Plans for a bridge were drawn up in the 1930s and revised in 1955 but work did not begin until 27 July 1972. The Humber Bridge Act, promoted by Kingston Upon Hull Corporation, was passed in 1959. This established the Humber Bridge Board to manage and raise funds to build the bridge and buy the land required for the approach roads.

1966 Kingston upon Hull North by-election

Raising funds proved impossible until the 1966 Kingston upon Hull North by-election. To save his government, Labour Prime Minister Harold Wilson prevailed upon his Minister of Transport Barbara Castle to sanction the building of the bridge. Dismay at the long wait for a crossing led to Christopher Rowe writing a protest song, "The Humber Bridge".

Design

Humber Bridge under construction - geograph.org.uk - 1599900
The deck under construction in May 1980. The deck was erected between October 1979 and July 1980

The consulting engineers for the project were Freeman Fox & Partners (now Arcadis NV). Sir Ralph Freeman had produced the first ideas in 1927 and in the early 1930s the cost of the project was estimated at £1.725 million and that the bridge would be unlikely to recoup the construction or maintenance costs. In 1935 he had an idea for a 4,500 ft (1,400 m) suspension bridge for the Humber Tunnel Executive Committee. Sir Gilbert Roberts produced more ideas in 1955 for a bridge with a 4,500 ft (1,400 m) central span, costing £15 million, to be paid for by East Riding County Council and Lindsey County Council. Once it was likely that a bridge would be constructed, Imperial College-educated Bernard Wex OBE (24 April 1922 – 31 July 1990) produced the design in 1964 that was actually built. The bridge was built to last 120 years. In 1985 Wex was awarded the Telford Medal by the Institution of Civil Engineers. In the 1950s he had helped to design High Marnham Power Station. He was a former UK chairman of the International Association of Bridge and Structural Engineers and helped to found the Steel Construction Institute in 1976.

The architect was R. E. Slater ARIBA. The administration building (for the tolls) was designed by Parker & Rosner. The landscaping was designed by Prof Arnold Weddle. Wind tunnel testing took place at the National Maritime Institute (now part of BMT Limited) at Teddington and the road deck is designed for wind speeds up to 105 miles per hour (170 km/h).

Construction

The main contractor for the steel superstructure was British Bridge Builders (the same grouping as for the Forth and Severn Road Bridges comprising Sir William Arrol & Co., then a unit of NEI Cranes Ltd, the Cleveland Bridge & Engineering and Redpath Dorman Long Ltd). The contractor for the concrete towers, anchorages and sub-structure was John Howard & Co Ltd of Chatham, Kent, who were later bought by Amec. Concrete was chosen for the towers, instead of steel, partly due to cost but also to fit the landscape.

Work began on the southern approach road in July 1972 by Clugston Construction of Scunthorpe. The 2.5 km (1.6 mi) approach road to the A1077 junction, by Costain Civil Engineering, began in September 1976. It included a 320 m (350 yd) span from the southern anchorage of seven pre-stressed concrete box sections and the A1077 junction, costing £4.25 million. Work on the bridge substructure (foundations) began in March 1973. To reduce heat of hydration in the concrete, which produces calcium silicate hydrate from belite, as much as 60 per cent of the Portland cement was replaced with ground granulated blast-furnace slag (GGBS). It took longer to build the southern anchorage due to a diaphragm wall design due to not enough shallow bedrock. The main southern approach roads from Barton to the M180 motorway junction at Barnetby were built in the late 1970s by Clugston Construction of Scunthorpe, opening in 1978.

The towers were constructed by slipforming and the north tower was completed by May 1974. The southern foundations were completed in September 1975, with the pier completed in March 1976 and the southern tower was completed by September 1976; the bridge had been planned to open in 1976. The northern tower and anchorage was built on solid chalk but the southern tower and anchorage were built on fissured Kimmeridge Clay, 500 m (550 yd) from the southern shore and built with a difficult caisson design. The subcontractor for the concrete was Tileman & Co. of Shipston-on-Stour, south Warwickshire.

Cable spinning took place between September 1977 and July 1979. Each cable weighs 5,500 t (5,400 long tons), with 37 strands of 404 lengths of cable. The cable on the northern span has four extra strands. Each cable can take a load of 19,400 t (19,100 long tons). The deck is of box girder form, the box sections around 140 t (140 long tons) each. The first box sections were assembled in June 1975 and put into the main span on 9 November 1979. The toll buildings and north approach road were built by A. F. Budge of Retford, Nottinghamshire, costing £2.9 million. Work began on the administration building in November 1976. The toll system was manufactured by Plessey Controls of Poole, Dorset. Corrosion resistance on the steelwork was provided by Camrex Corrosion of Bellshill, North Lanarkshire. The road was laid by Tarmac Roadstone of Wolverhampton with mastic asphalt. In 2017, the bridge was designated a Grade I listed building.

Opening

The bridge opened to traffic on 24 June 1981. It was opened officially by Queen Elizabeth II on 17 July 1981 a ceremony which included a prayer of dedication by the Archbishop of York and a fly-past by the Red Arrows.

World record

With a centre span of 1,410 m (4,630 ft; 0.88 mi) and a total length of 2,220 m (7,280 ft; 1.38 mi), the Humber Bridge was the longest single-span suspension bridge in the world for 17 years, until the Akashi Kaikyō Bridge opened in Japan on 5 April 1998. However, the bridge remains the longest of its type that you can walk/cycle across.

Local benefits

The road-distance between Hull and Grimsby fell by nearly 50 mi (80 km); the town of Scunthorpe and environs were relieved of the passing traffic between the two.

Bridge statistics

The bridge's surface takes the form of a dual carriageway with a lower-level foot and cyclepath on both sides. There is a permanent 50 mph (80 km/h) speed limit on the full length of the bridge.

Each tower consists of a pair of hollow vertical concrete columns, each 155.5 m (510 ft) tall and tapering from 6 m (20 ft) square at the base to 4.5 m × 4.75 m (14.8 ft × 15.6 ft) at the top. The bridge is designed to tolerate constant motion and bends more than 3 m (10 ft) in winds of 80 mph (129 km/h). The towers, although vertical, are 36 mm (1.4 in) farther apart at the top than the bottom due to the curvature of the earth. The total length of the suspension cable is 71,000 km (44,000 mi). The north tower is on the bank, and has foundations down to 8 m (26 ft). The south tower is in the water, and descends to 36 m (118 ft) as a consequence of the shifting sandbanks that make up the estuary.

The bridge held the record for the world's longest single-span suspension bridge for 16 years, from its opening in July 1981 until the opening of the Great Belt Bridge in June 1997. The bridge was relegated to third place with the opening of the Akashi Kaikyō Bridge in April 1998. In 2019 it became the eleventh longest, single-span suspension bridge. The central span, at 1,410 m (4,630 ft; 0.88 mi), is the longest in Britain. It remains the longest single-span suspension bridge in the world that can be crossed on foot or by bicycle. The bridge is crossed twice during the annual Humber Bridge in June half marathon and Hull Marathon in September.

Toll update project

In July 2013, work began on introducing a new electronic tolling system. The existing Humber Bridge toll system was largely the same as it was when the bridge opened in 1981. The computer system was over 15 years old, absorbed an increasing amount of maintenance and needed to be replaced. The project to modernise the tolls, decreased waiting times and was welcomed by business and transport leaders.

In the first phase, the toll booths and the toll plaza canopy were replaced and in the second phase writing, testing and setting up the new toll system was completed. From 2015 bridge users could set up an account with the bridge and pay into it. Account holders receive a device called the HumberTAG, a small electronic tag that enables the system to recognise the bridge user; the toll is automatically deducted from the user's account. Two central lanes through the plaza are free-flowing; they do not have booths and account holders are able to cross the bridge without stopping.

Finances

The bridge had a toll charge of £1.50 for cars from 1 April 2012, until for six months it was £3.00 and the only trunk road British toll bridge to charge motorcycles (£1.20). In 2004 many motorcyclists held a slow-pay protest, taking off gloves and helmets and paying the toll in large denomination bank notes. Police reported that the protest caused a queue 4 mi (6 km) long.

In 1996, Parliament passed the Humber Bridge (Debts) Act 1996 to reorganise the board's liabilities to ensure the bridge could be safely maintained. Much of the interest on the debt was suspended and deferred in a refinancing which saw no write off – the balance was to be paid using tolls.

In 2006 a (Private Member's) Humber Bridge Bill was tabled by Cleethorpes's Labour MP Shona McIsaac. The Bill would have made amendments to the Act of 1959 "requiring the Secretary of State to give directions to members of the Humber Bridge Board regarding healthcare and to review the possibility of facilitating journeys across the Humber Bridge in relation to healthcare". The aim was to allow patients travelling between the banks for medical treatment to cross without paying the toll and to allow the Secretary of State for Transport to appoint two members of the board to represent the interests of the NHS. Even though the Bill received cross-party support (it was co-sponsored by Shadow Home Secretary David Davis and supported by all other MPs representing North Lincolnshire and the East Riding of Yorkshire) it ran out of time later that year.

A protest at the bridge on 1 September 2007 was supported by the local Cancer Patients Involvement Group, the Road Haulage Association, Yorkshire and the Humber MEP Diana Wallis and local business and council representatives. The government responded to the petition on 14 January 2008, stating that "Concessions or exemptions from tolls on the Humber Bridge are a matter for the Humber Bridge Board".

In October 2008, a joint campaign was launched by the Scunthorpe Telegraph, Hull Daily Mail and Grimsby Telegraph to abolish the toll. The papers' campaign, A Toll Too Far, was launched after a mooted increase in the toll, receiving much support from councillors and MPs serving Lincolnshire and the East Riding of Yorkshire. The campaign was to stave off a potential increase, secure a reduction to £1.00 and ultimately to be abolished. Thousands of readers backed the campaign with a paper and an online petition.

A public inquiry into the tolls was held in March 2009 by independent inspector Neil Taylor. In July 2009, the Department for Transport announced that it had decided not to allow the proposed increase. Transport Minister Sadiq Khan said he did not believe it was right for the tolls to be raised in the current economic climate. In October 2009, the government approved a £6 million grant for maintenance costs, which meant that there would be no toll increase before 2011 at the earliest, by which time tolls would have been frozen for five years.

The board applied again to the Department of Transport in September 2010, to raise the tolls from April 2011 but the government ordered a public inquiry into the application. A three-day public inquiry was held in Hull in early March 2011. Following the recommendation by the planning inspector, the government gave approval, on 14 June 2011, for the increase. The toll was raised on 1 October 2011, at which point it became the most expensive in the United Kingdom. The Severn Bridge/Second Severn Crossing charged £5.70 for Wales-bound traffic.

In the 2011 Autumn Statement on 29 November, the Chancellor of the Exchequer, George Osborne, announced that the government had agreed to reduce the debt on the bridge by £150 million, which would allow the toll for cars to be halved to £1.50. Following the government accepting the agreement, between the four local councils, to meet a portion of the debt if revenues proved insufficient, the Transport Secretary, Justine Greening, confirmed the reduction on 29 February 2012, with effect from April.