kids encyclopedia robot

Clifton Suspension Bridge facts for kids

Kids Encyclopedia Facts
Quick facts for kids
Clifton Suspension Bridge
Clifton Suspension Bridge-9350.jpg
Clifton Suspension Bridge
Coordinates 51°27′18″N 2°37′40″W / 51.4549°N 2.6279°W / 51.4549; -2.6279
Carries B3129 road, cars, pedestrians and cyclists
Crosses River Avon
Locale Bristol
Maintained by Clifton Suspension Bridge Trust
Characteristics
Design Suspension bridge
Total length 1,352 ft (412 m)
Width 31 ft (9.4 m)
Height 331 ft (101 m) above high water level (86 ft (26 m) above deck)
Longest span 702 ft 3 in (214.05 m)
Clearance below 245 ft (75 m) above high water level
History
Opened 1864
Statistics
Daily traffic 8,800
Toll Vehicles £1.00
Clifton Suspension Bridge is located in Bristol
Clifton Suspension Bridge
Location in Bristol

The Clifton Suspension Bridge is a suspension bridge spanning the Avon Gorge and the River Avon, linking Clifton in Bristol to Leigh Woods in North Somerset. Since opening in 1864, it has been a toll bridge, the income from which provides funds for its maintenance. The bridge is built to a design by William Henry Barlow and John Hawkshaw, based on an earlier design by Isambard Kingdom Brunel. It is a grade I listed building and forms part of the B3129 road.

The idea of building a bridge across the Avon Gorge originated in 1753. Original plans were for a stone bridge and later iterations were for a wrought iron structure. In 1831, an attempt to build Brunel's design was halted by the Bristol riots, and the revised version of his designs was built after his death and completed in 1864. Although similar in size, the bridge towers are not identical in design, the Clifton tower having side cut-outs, the Leigh tower more pointed arches atop a 110-foot (34 m) red sandstone-clad abutment. Roller-mounted "saddles" at the top of each tower allow movement of the three independent wrought iron chains on each side when loads pass over the bridge. The bridge deck is suspended by 162 vertical wrought-iron rods in 81 matching pairs.

The Clifton Bridge Company initially managed the bridge under licence from a charitable trust. The trust subsequently purchased the company shares, completing this in 1949 and took over the running of the bridge using the income from tolls to pay for maintenance. The bridge is a distinctive landmark, used as a symbol of Bristol on postcards, promotional materials, and informational web sites. It has been used as a backdrop to several films and television advertising and programmes. It has also been the venue for significant cultural events such as the first modern bungee jump in 1979, the last Concorde flight in 2003 and a handover of the Olympic Torch relay in 2012.

History

Plans

It is unknown when the first bridge was constructed across the Avon in Bristol, but the first stone bridge, Bristol Bridge, was built in the 13th century. It had houses with shopfronts built on it to pay for its maintenance. A 17th-century illustration shows that these bridge houses were five storeys high, including the attic rooms, and that they overhung the river much as Tudor houses would overhang the street. In the 1760s a bill to replace the bridge was carried through parliament by the Bristol MP Sir Jarrit Smyth. By the early 18th century, increase in traffic and the encroachment of shops on the roadway made the bridge fatally dangerous for many pedestrians. A new bridge, designed by James Bridges and finished by Thomas Paty was built in 1769 and 1776. Resentment at the tolls exacted to cross the new bridge occasioned the Bristol Bridge Riot of 1793. Other crossings were considered, but were restricted by Admiralty rules that stipulated that any bridge had to be at least 100 feet (30 m) above the water to allow the passage of tall-masted warships to Bristol Harbour. To achieve this, any bridge constructed between Bristol Bridge and Avon Gorge, from Hotwells to Ashton Gate, would require massive embankments and viaducts. The alternative was to build across the narrowest point of the Avon Gorge, well above the height required for shipping.

William Bridges design for the Clifton bridge
William Bridges' design

In 1753 Bristolian merchant William Vick had left a bequest in his will of £1,000 (equivalent to £130,000 in 2021), invested with instructions that when the interest had accumulated to £10,000 (£1,320,000), it should be used for the purpose of building a stone bridge between Clifton Down (which was in Gloucestershire, outside the City of Bristol, until the 1830s) and Leigh Woods in Somerset. Although there was little development in the area before the late 18th century, as Bristol became more prosperous, Clifton became fashionable and more wealthy merchants moved to the area. In 1793 William Bridges published plans for a stone arch with abutments containing factories, which would pay for the upkeep of the bridge. The French Revolutionary Wars broke out soon after the design was published, affecting trade and commerce, so the plans were shelved. In 1811 Sarah Guppy patented a design for a suspension bridge across the gorge but this was never realised and was not submitted to the later competition.

'St Vincent rock near Bristol' RMG PY6092
St Vincent Rock before construction began

By 1829, Vick's bequest had reached £8,000, but it was estimated that a stone bridge would cost over ten times that. A competition was held to find a design for the bridge with a prize of 100 guineas. Entries were received from 22 designers, including Samuel Brown, James Meadows Rendel, William Tierney Clark and William Hazledine. Several were for stone bridges and had estimated costs of between £30,000 and £93,000. Brunel submitted four entries. The judging committee rejected 17 of the 22 plans submitted, on the grounds of appearance or cost. They then called in Scottish civil engineer Thomas Telford to make a final selection from the five remaining entries. Telford rejected all the remaining designs, arguing that 577 feet (176 m) was the maximum possible span. Telford was then asked to produce a design himself, which he did, proposing a 110-foot-wide (34 m) suspension bridge, supported on tall Gothic towers, costing £52,000.

The Bridge Committee which had been set up to look at the designs sponsored the Clifton Bridge Bill which became an Act when the Bill received the Royal Assent on the 29th May, 1830. The Act appointed three Trustees to carry through the purposes of the Act, with powers to appoint more up to a total not exceeding thirty five or less than twenty. The three Trustees named in the Act were the Master of the Society of Merchant Venturers, the Senior Sheriff of the City and County of Bristol and Thomas Daniel. The Act allowed a wrought iron suspension bridge to be built instead of stone, and tolls levied to recoup the cost.

The three Trustees named in the Act met on the 17th June 1830 and appointed further Trustees, bringing the total up to 23. There were additions to this number in the weeks which followed, so by early July 1830 there were 31 in all, although not everyone had been formally sworn in by that date. Others included Thomas Durbin Brice, Master of the Society of Merchant Venturers, George Daubeny, John Cave, John Scandrett Harford, George Hilhouse, Henry Bush, and Richard Guppy.

The first full meeting of the Trustees was held on the 22nd June 1830 in the Merchants Hall in Bristol. Alderman Thomas Daniel was in the Chair. 86 people had committed £17,350, an average of just over £200 each.

These funds raised during the first few months of 1830 were not sufficient for the construction. Despite this Brunel produced a new proposal costing £10,000 less than Telford's design and gained support for it in the local press. James Meadows Rendel, William Armstrong and William Hill also submitted new, cheaper proposals, complaining that the committee had not set a budget. In 1831 a second competition was held, with new judges including Davies Gilbert and John Seaward examining the engineering qualities of the proposals. Thirteen designs were submitted; Telford's was the only one in which the chains achieved the weight per square inch required by the judges but it was rejected as being too expensive. The winner was declared to be a design by Smith and Hawkes of the Eagle Foundry in Birmingham. Brunel had a personal meeting with Gilbert and persuaded him to change the decision. The committee then declared Brunel the winner and he was awarded a contract as project engineer. The winning design was for a suspension bridge with fashionably Egyptian-influenced towers. In 2010, newly discovered letters and documents revealed that, in producing his design, Brunel had taken advice from his father, Sir Marc Isambard Brunel. The elder Brunel had recommended including a central support for the bridge, as he did not believe a single-span bridge of such length could be constructed. His son chose to ignore his advice.

Construction

A ceremony to mark the start of the construction works was held Monday 20 June 1831. Work started on blasting of St. Vincent's Rock, on the Clifton side of the gorge. Four months later work was halted by the Bristol riots, which took place after the House of Lords rejected the second Reform Bill, which aimed to eliminate some of the rotten boroughs and give parliamentary seats to Britain's fast growing industrial towns such as Bristol. Five to six hundred young men were involved in the riots and Brunel was sworn in as a special constable. The riots severely dented commercial confidence in Bristol; subscriptions to the bridge company ceased, and along with it, further construction of the bridge.

Suspension bridge at Clifton
An 1878 drawing of the Clifton Suspension Bridge

After the passing of the Act for the Great Western Railway reestablished financial confidence, work resumed in 1836, but subsequent investment proved woefully inadequate. Despite the main contractors going bankrupt in 1837, the towers were built in unfinished stone. To enable the transfer of materials, a 1,000-foot-long (300 m) iron bar, which was 1.25 inches (32 mm) in diameter, had been drawn by capstan across the gorge. A contract was placed with Dowlais Ironworks to supply 600 tons of bar iron, which was to be transported to the Copperhouse foundry to be forged into bar chains. By 1843 funds were exhausted and another £30,000 was needed. As the work had exceeded the time limit stated in the Act, all work stopped. Brunel suggested building a deep water pier at Portbury, which would make the bridge an essential road link, but funds for this scheme were not forthcoming. In 1851, the ironwork was sold and used to build the Brunel-designed Royal Albert Bridge on the railway between Plymouth and Saltash. The towers remained and during the 1850s intrepid passengers could cross the gorge in a basket slung from the iron bar.

Commemorative plaque on the Clifton Suspension Bridge
The plaque on the bridge

Brunel died in 1859, without seeing the completion of the bridge. His colleagues in the Institution of Civil Engineers felt that completion of the Bridge would be a fitting memorial, and started to raise new funds. In 1860, Brunel's Hungerford suspension bridge over the Thames in London was demolished to make way for a new railway bridge to Charing Cross railway station. Its chains were purchased for use at Clifton.

A revised design was made by William Henry Barlow and Sir John Hawkshaw, with a wider, higher and sturdier deck than Brunel intended, with triple chains instead of double.

It has been argued that the size and technology of these revisions was so great that the credit for its design should go to Barlow and Hawkshaw. The towers remained in rough stone, rather than being finished in the Egyptian style. Work on the bridge was restarted in 1862. Initially a temporary bridge was created by pulling ropes across the gorge and making a footway of wire ropes with wood planks held together with iron hoops. This was used by the workers to move a "traveller", consisting of a light frame on wheels, to transport each link individually, which would eventually make up the chains supporting the bridge. The chains are anchored in tapering tunnels, 25 metres (82 ft) long, on either side of the bridge and plugs of Staffordshire blue brick infilled to prevent the chains being pulled out of the narrower tunnel mouth. After completion of the chains, vertical suspension rods were hung from the links in the chains and large girders hung from these. The girders on either side then support the deck, which is 3 feet (0.91 m) higher at the Clifton end than at Leigh Woods so that it gives the impression of being horizontal. The strength of the structure was tested by spreading 500 tons of stone over the bridge. This caused it to sag by 7 inches (180 mm), but within the expected tolerances. During this time a tunnel was driven through the rocks on the Leigh Woods side beneath the bridge to carry the Bristol Port Railway to Avonmouth. The construction work was completed in 1864–111 years after a bridge at the site was first planned.

Operation

Clifton.bridge.arp.750pix
View from the observatory on Clifton Down

On 8 December 1864, the bridge was lit by magnesium flares for its ceremonial opening parade, but they were blown out by the wind. The custom of lighting the bridge has continued with more recent events, although later thousands of electric light bulbs were attached to the bridge instead of flares.

In 1860 the Clifton Bridge Company was set up to oversee the final stages of completion and manage the operation of the bridge. They paid £50 each year to the trustees who gradually purchased the shares in the company. The revenues from tolls were minimal initially as there was not much traffic; however, this increased after 1920 with greater car ownership. In 1949 the trustees purchased all the outstanding shares and debentures. The bridge is managed by a charitable trust, originally formed by the Society of Merchant Venturers following Vick's bequest. The trust was authorised to manage the bridge and collect tolls by Acts of Parliament in 1952, 1980 and 1986. A toll of £0.50 has been levied on vehicles since 2007, but the £0.05 toll that the Act allows for cyclists or pedestrians is not collected. Human toll collectors were replaced by automated machines in 1975. The tolls are used to pay for the upkeep of the bridge, including the strengthening of the chain anchor points, which was done in 1925 and 1939, and regular painting and maintenance, which is carried out from a motorised cradle slung beneath the deck. By 2008 over 4 million vehicles crossed the bridge each year. In February 2012, the bridge trustees applied to the Department for Transport to increase the toll to £1, subsequently implemented on 24 April 2014.

On 1 April 1979, the first modern bungee jumps were made from the bridge by members of the University of Oxford Dangerous Sports Club. In 2003 and 2004, the weight of crowds travelling to and from the Ashton Court Festival and Bristol International Balloon Fiesta put such great strain on the bridge that it was decided to close the bridge to all motor traffic and pedestrians during the events. The closure of the bridge for major annual events has continued each year since then.

CliftonSupensionLit
The bridge illuminated; these lights have since been replaced with LEDs

On 26 November 2003, the last Concorde flight (Concorde 216) flew over the bridge before landing at Filton Aerodrome. In April 2006, the bridge was the centrepiece of the Brunel 200 weekend, celebrating the 200th anniversary of the birth of Isambard Kingdom Brunel. At the climax of the celebration a firework display was launched from the bridge. The celebrations also saw the activation of an LED-based lighting array to illuminate the bridge.

On 4 April 2009, the bridge was shut for one night to allow a crack in one of the support hangers to be repaired. On 23 May 2012, the London 2012 Olympic Torch relay crossed over the bridge, where two of the torchbearers came together in a "kiss" to exchange the flame in the middle of Brunel's iconic landmark. The bridge carries four million vehicles per year, along part of the B3129 road. The bridge is a grade I listed building.

In November 2011 it was announced that a new visitor centre, costing nearly £2 million, was to be built at the Leigh Woods end of the bridge to replace the temporary building currently being used. The new facilities were scheduled to be completed before the 150th anniversary of the opening, which was celebrated on 8 December 2014. In December 2012 it was announced that the bridge had received £595,000 of funding from the Heritage Lottery Fund to improve the visitor centre.

Archives

The University of Bristol Special Collections holds substantial records related to the bridge. Letter books of the trustees of Clifton Suspension Bridge dated 1831–1862 are held at Bristol Archives (Ref. 12167/42-44) (online catalogue).

Engineering

Uk bristol csbchains
One of the chains, taken from the original Hungerford Bridge on the Thames

Although similar in size the bridge towers are not identical in design, the Clifton tower having side cut-outs whilst the Leigh tower has more pointed arches and chamfered edges. Brunel's original plan proposed they be topped with then-fashionable sphinxes, but the ornaments were never constructed.

Clifton Suspension Bridge (abutment interior)
Looking up at the arched ceiling of the interior of the abutment under the Leigh Woods side of the bridge, showing stalactites.

The 85-foot-tall (26 m) Leigh Woods tower stands atop a 110-foot (34 m) red sandstone-clad abutment. In 2002 it was discovered that this was not a solid structure but contained 12 vaulted chambers up to 35 feet (11 m) high, linked by shafts and tunnels.

Roller-mounted "saddles" at the top of each tower allow movement of the chains when loads pass over the bridge. Though their total travel is minuscule, their ability to absorb forces created by chain deflection prevents damage to both tower and chain.

The bridge has three independent wrought iron chains per side, from which the bridge deck is suspended by eighty-one matching vertical wrought-iron rods ranging from 65 feet (20 m) at the ends to 3 feet (0.91 m) in the centre. Composed of numerous parallel rows of eyebars connected by bolts, the chains are anchored in tunnels in the rocks 60 feet (18 m) below ground level at the sides of the gorge. The deck was originally laid with wooden planking, later covered with asphalt, which was renewed in 2009. The weight of the bridge, including chains, rods, girders and deck is approximately 1,500 tons.

Dimensions

  • Clearance: 245 ft (75 m) above high water level
  • Dip of chains: 70 ft (21.34 m)
  • Height of towers: 86 ft (26 m) above deck
  • Overall length: 1,352 ft (412 m)
  • Overall width: 31 ft (9.45 m)
  • Span: 702 ft 3 in (214.05 m)

Gallery