STS-109
STS-109 Repaired and Reconfigured Hubble.jpg
The Hubble Space Telescope in Columbia's payload bay towards the end of the mission
Mission type Hubble servicing
Operator NASA
Mission duration 10 days, 22 hours, 11 minutes, 09 seconds
Distance travelled 6,300,000 kilometres (3,900,000 mi)
Orbits completed 165
Spacecraft properties
Spacecraft Space Shuttle Columbia
Launch mass 116,989 kg (257,917 lb)
Landing mass 100,564 kg (221,706 lb)
Crew
Crew size 7
Members
  • Scott D. Altman
  • Duane G. Carey
  • John M. Grunsfeld
  • Nancy J. Currie
  • Richard M. Linnehan
  • James H. Newman
  • Michael J. Massimino
Start of mission
Launch date 1 March 2002 11:22:02 (2002-03-01UTC11:22:02Z) UTC
Launch site Kennedy LC-39A
End of mission
Landing date 12 March 2002 09:33:10 (2002-03-12UTC09:33:11Z) UTC
Landing site Kennedy SLF Runway 33
Orbital parameters
Reference system Geocentric
Regime Low Earth
Perigee 486 km (302 mi)
Apogee 578 km (359 mi)
Inclination 28.5 degrees
Period 95.3 minutes
STS-109 patch.svg STS-109 crew.jpg
(L-R): Michael J. Massimino, Richard M. Linnehan, Duane G. Carey, Scott D. Altman, Nancy J. Currie, John M. Grunsfeld and James H. Newman.
← STS-108
STS-110 →

STS-109 (SM3B) was a Space Shuttle mission that launched from the Kennedy Space Center on 1 March 2002. It was the 108th mission of the Space Shuttle program, the 27th flight of the orbiter Columbia and the fourth servicing of the Hubble Space Telescope. It was also the last successful mission of the orbiter Columbia before the ill-fated STS-107 mission, which culminated in the Columbia disaster.

The Hubble Space Telescope (HST) was placed in orbit during mission STS-31 on 25 April 1990. Initially designed to operate for 15 years, plans for periodic service and refurbishment were incorporated into its mission from the start. After the successful completion of the second planned service mission (SM2) by the crew of STS-82 in February 1997, three of the telescope's six gyroscopes failed. NASA decided to split the third planned service mission into two parts, SM3A and SM3B. A fifth and final servicing mission, STS-125 (SM4) launched on 11 May 2009. The work performed during SM4 kept HST in operation through 2021.

Crew

Position Astronaut
Commander Scott D. Altman
Third spaceflight
Pilot Duane G. Carey
Only spaceflight
Mission Specialist 1 John M. Grunsfeld
Fourth spaceflight
Mission Specialist 2 Nancy J. Currie
Fourth and last spaceflight
Mission Specialist 3 Richard M. Linnehan
Third spaceflight
Mission Specialist 4 James H. Newman
Fourth and last spaceflight
Mission Specialist 5 Michael J. Massimino
First spaceflight

Spacewalks

Hubble Space Telescope SM3B
Hubble Space Telescope sporting new solar arrays during SM3B.
EVA Team Start – UTC End – UTC Duration
1 Grunsfeld
Linnehan
4 March 2002, 06:37 4 March 2002, 13:38 7:01
2 Newman
Massimino
5 March 2002, 06:40 5 March 2002, 13:56 7:16
3 Grunsfeld
Linnehan
6 March 2002, 08:28 6 March 2002, 15:16 6:48
4 Newman
Massimino
7 March 2002, 09:00 7 March 2002, 16:18 7:18
5 Grunsfeld
Linnehan
8 March 2002, 08:46 8 March 2002, 16:18 7:32

Mission highlights

STS-109-HST-s109e5700
Hubble Space Telescope after servicing by the crew of STS-109

The purpose of STS-109 was to service the Hubble Space Telescope (HST). It was Columbia's first flight following an extensive two and a half year modification period (its most recent mission being STS-93). During the mission the crew installed a new science instrument, the Advanced Camera for Surveys (ACS), new rigid solar arrays (SA3), a new Power Control Unit (PCU) and an experimental cryocooler for the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). Columbia also reboosted HST to a higher orbit.

STS-109 launch
STS-109 Launch
ACS FOC swap
Astronauts remove the FOC to make room for the ACS

The STS-109 astronauts performed a total of five spacewalks in five consecutive days to service and upgrade the Hubble Space Telescope. The spacewalkers received assistance from their crewmates inside Columbia. Currie operated the Shuttle's robot arm while Altman was her backup. Carey and Altman documented the EVA activities with video and still images.

Accomplishments of the spacewalks included the installation of new solar arrays, a new camera, a new Power Control Unit, a Reaction Wheel Assembly and an experimental cooling system for the NICMOS unit. STS-109 accumulated a total of 35 hours, 55 minutes of EVA time. Following STS-109, a total of 18 spacewalks had been conducted during four Space Shuttle missions to service Hubble (the others being STS-61, STS-82, STS-103 and STS-125) for a total of 129 hours, 10 minutes by 14 different astronauts.

Hubble on the payload bay just prior to being released by the STS-109 crew
Hubble on the payload bay just prior to being released by the STS-109 crew.

It was also the last successful flight of Columbia, as on its next mission, STS-107, it disintegrated on re-entry, killing all aboard.

STS-109 is considered a night launch, as sunrise was at 6:47 am, and Columbia launched at 6:22 am EST, 25 minutes before sunrise.

Attempt Planned Result Turnaround Reason Decision point Weather go (%) Notes
1 21 Feb 2002, 10:22:00 am Scrubbed Mission replanning
2 28 Feb 2002, 6:48:00 am Scrubbed 6 days, 20 hours, 26 minutes Technical 21 Feb 2002, 10:00 am 60% Wrong bearings installed on Columbia's main landing gear
3 1 Mar 2002, 6:22:02 am Success 0 days, 23 hours, 34 minutes