tunnel portals
The southern portals of the newer double-track tunnel, and of the closed older single-track tunnel in 2011
Overview
Line Newmarket Line
Location Parnell, Auckland, New Zealand
Coordinates 36°51′43″S 174°46′53″E / 36.862°S 174.7815°E / -36.862; 174.7815
Status in use
Operation
Work begun 1864 (original tunnel)
1914 (second tunnel)
Closed after 1930 (original tunnel)
Technical
Length 344.5 m (1,130 ft)
No. of tracks 2
Gauge 1,067 mm (3 ft 6 in)

The Parnell Tunnel is a railway tunnel under Parnell, Auckland, New Zealand. It is 344.5 metres (1,130 ft) long, and is on the Newmarket Line.

The tunnel allows the Western, Southern and Onehunga lines coming from the Newmarket Train Station to Britomart Transport Centre to pass under the Parnell Ridge before dropping to harbour level.

There are two Parnell Tunnels, an older now unused single-track tunnel and a newer double-track tunnel which superseded it. The older tunnel was closed off and has not been in use for most of the last century.

The older tunnel, originally intended in part to provide a connection to Drury for the New Zealand Wars, has been lauded as having enabled the first public railway line in Auckland, and opening the city up to the wider New Zealand.

First tunnel

First Parnell Tunnel Being Built I
The first tunnel being built in the early 1870s, seen from the northern portal.

The first tunnel shaft was constructed as part of the initial construction of the line. However, works took a very long time - 9 years - having started in 1864. This was partly due to funding issues, but also due to a massive land slip which occurred at the northern end, with investigation of the causes and removal of the slip holding up the works for a long time. After the tunnel was pierced through in June 1872, work speeded up and it was finished in February 1873.

The first tunnel and its approach were relatively steep, often requiring double engines to pull the trains and there are records of the "inconvenient habit" of some "well-loaded" passenger trains coming to a standstill on the gradient in the tunnel. The tunnel was also apparently known for forcing large amounts of steam locomotive fumes into the passenger coaches. During events like Cup Day at Ellerslie Racecourse, when extra trains needed to be provided for the large numbers of travellers (with the trains often composed of open cattle trucks) the sparks thrown by the locomotives tended to rebound into open carriages, often causing burn holes in passengers' clothing. The newspapers of the time often commented on this in sarcastic form.

Due to these drawbacks, after construction of the second tunnel, the old tunnel was quickly demoted to only serve for shunting and non-passenger traffic and was eventually closed fully (sometime after 1930). In World War II, it was temporarily converted into an air-raid shelter for Parnell residents, with baffle gates across the entries to protect against blasts.

There is a proposal to re-open this old tunnel to pedestrians and cyclists, as part of cycleway projects in the area.

Second tunnel

Campaign

In the 1900s it became increasingly clear that the single-track tunnel, despite having a double-track line at the northern end, was creating significant 'delay, discomfort and danger'. When in 1905 the government declared that the line on the southern side would be duplicated to Penrose, many Aucklanders reacted angrily when it was later clarified that this would not include a tunnel duplication.

The Minister of Railways, Joseph Ward, argued that his staff had convinced him that it was not [yet] essential to duplicate the tunnel to remediate the delays. However, in a strange twist, he moved at the end of a meeting with a 200-strong citizens deputation that if "ten representative [business]men", selected by the Mayor of Auckland, would traverse the section with him, and then ask for the tunnel duplication, he would be willing to proceed with it. At the time, it seems that Aucklanders agreed that, with the duplication from Newmarket to Penrose Train Station still pending, duplication of the tunnel via this scheme would not be seemly.

In 1910, with Ward having become New Zealand's 17th Prime Minister - and with the Newmarket-Penrose side of the tunnel now also duplicated - Clr Mackay of Auckland City Council resurrected the old pledge made by Ward. Newspapers of the time noted that while the duplication was certainly necessary, it remained unseemly to bring about the second tunnel in this way, with a "stacked" body of men asking for it, despite the definite way in which Ward had phrased his pledge - leaving him no honourable alternative to now decline it.

The 10-man committee was indeed formed in 1910, and apparently investigated in detail, in the face of continuing government resistance. In the end, in 1911, only 7 of them recommended duplication, with 3 opposed. The opposition was possibly caused by the concern that the tunnel duplication would prevent a goods shed expansion, and because it had been advised that timetabling could work around the limitations of the single-track tunnel. Government had previously argued that up to 240 trains daily (one every 6 minutes) could be run through the single-track tunnel, and thus, the cost of £35,000-£40,000 for the duplication was not merited when other projects were of greater importance. Due to the lack of unanimous agreement - and because the Railways Department argued the tunnel could take twice the traffic using it at the time - duplication was again declined.

However, there was considerable discontent in Auckland during the 1900s and 1910s that the government was proceeding with major tunneling works in the South Island, such as at the Otira tunnel to Arthur's Pass, while arguing that there was no funding available for the Parnell Tunnel. Groups like the Auckland Chamber of Commerce lobbied strenuously for the duplication.

At the same time, proposals to either take a new line up Grafton Gully, or build a new line via Orakei (which was eventually constructed as the Eastern Line), thus avoiding the almost 1:50 gradient up to the Parnell Tunnel, may have contributed to doubts as to whether the tunnel should be duplicated. There was also a perception by the minister of the day that additional freight traffic generated by the North Auckland Line would not be worth considering as an argument for the tunnel, as it would be extremely limited.

While duplication was finally noted as 'definitely agreed' in 1912, funding was not immediately found. However, the impending move of the engine sheds for the railway from Auckland Railway Station to the Newmarket Workshops also increased pressure to ensure the duplication.

Construction

A new tunnel, able to carry a double set of tracks, was finally built over the 1914–1915 period. The first preparatory works occurred around April 1914, widening the approaches to the tunnel, and the first air shaft connecting the two drives was pierced through in January 1915. From initially 50 people, the workforce had by then expanded to 140.

Approximately 25,000 cubic yards of earth were removed for the tunnel, for a shaft 25feet 9 inch wide, and 18feet 2 inch high. The walls were constructed in concrete, and almost three quarters of a million bricks were used for the arch, in 4-6 layers. The second tunnel was also constructed to a less challenging gradient than the first.

The tunnel was immediately lauded for the improvements to rail efficiency and safety, now allowing double tracks over the whole line between Britomart and Penrose. By 1926, about 150 trains were passing through the tunnel each day.

Upgrades

In January 2010, the tracks within the Parnell Tunnel were removed during a summer network closure, and the tunnel floor lowered by between 20 and 35 cm, to prepare the tunnel for the coming electrification of the Auckland rail network. Stormwater drainage was also improved as part of the work, with the insufficient quality of the drains (and the earlier attempts to fix them) having forced authorities to place speed restrictions on the tunnel in the past.