Image: TBM S-210 Alptransit Faido East
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 1,600 × 1,200 pixels.
Original image (1,600 × 1,200 pixels, file size: 552 KB, MIME type: image/jpeg)
Description: Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland (all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m / 29 ft., length of the TBM is 400 m / 1312 ft.)
Title: TBM S-210 Alptransit Faido East
Credit: Own work
Author: Cooper.ch 16:58, 19 September 2006 (UTC)
Permission: hereby released under CC-BY-SA-2.5
Usage Terms: Creative Commons Attribution-Share Alike 2.5
License: CC BY-SA 2.5
License Link: http://creativecommons.org/licenses/by-sa/2.5
Attribution Required?: Yes
Image usage
The following 2 pages link to this image:
All content from Kiddle encyclopedia articles (including the article images and facts) can be freely used under Attribution-ShareAlike license, unless stated otherwise.