Image: Extraction of TBM Don at Yonge&Eglinton
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 1,600 × 1,200 pixels.
Original image (1,600 × 1,200 pixels, file size: 303 KB, MIME type: image/jpeg)
Description: Tunnel Boring Machine "Don" was extracted in pieces starting on March 13, 2017. The first piece extracted (see photo) was the machine's cutting face.
Title: Extraction of TBM Don at Yonge&Eglinton
Credit: Own work
Author: TheTrolleyPole
Usage Terms: Creative Commons Attribution-Share Alike 4.0
License: CC BY-SA 4.0
License Link: https://creativecommons.org/licenses/by-sa/4.0
Attribution Required?: Yes
Image usage
The following page links to this image:
All content from Kiddle encyclopedia articles (including the article images and facts) can be freely used under Attribution-ShareAlike license, unless stated otherwise.