Bukit Panjang LRT Line facts for kids
Quick facts for kids BPLRT Bukit Panjang LRT line Laluan LRT Bukit Panjang 武吉班让轻轨线 பக்கிட் பஞ்சாங் வரி |
|
---|---|
Overview | |
Status | Operational |
Owner | Land Transport Authority |
Termini | Choa Chu Kang Ten Mile Junction (to cease operations in Q4 2018) |
Stations | 14; 1 to cease operations in Q4 2018 |
Service | |
Type | Automated guideway transit/People mover |
System | Light Rail Transit (Singapore) |
Services | 3; 1 to cease operating in Q4 2018 |
Operator(s) | SMRT Light Rail (SMRT Corporation) |
Depot(s) | Ten Mile Junction |
Rolling stock | Bombardier Innovia APM 100 C801 Bombardier Innovia APM 100 C801A Bombardier Innovia APM 300 (future) |
Daily ridership | 62,700 |
History | |
Opened | 6 November 1999 |
Technical | |
Line length | 7.8 km (4.8 mi) |
Character | Elevated |
Electrification | 600V AC Third rail |
The Bukit Panjang LRT Line is a LRT Line in Singapore.
The line takes about 28 minutes for the full loop. This route starts at the Choa Chu Kang and travels around the Bukit Panjang area.
This line uses C801 and C801A trains.
History
The Bukit Panjang LRT was first opened on 6 November 1999. Ten Mile Junction Station was closed from 10 December 2010 to 30 December 2011.
Services
There are three services on the line: A and B terminate at Choa Chu Kang, and C ends at Ten Mile Junction.
Service | Terminal | via | Notes |
A | Choa Chu Kang | Senja | Senja to Petir Clockwise direction |
---|---|---|---|
B | Choa Chu Kang | Petir | Petir to Senja Anti-clockwise direction |
C | Ten Mile Junction | Senja | Operates every 20 Minutes. Loops clockwise via Senja to Petir |
Stations
All stations, except Choa Chu Kang and Ten Mile Junction, have two facing side platforms. Choa Chu Kang has an island platform, similar to most Singapore MRT stations, while Ten Mile Junction has only a single platform and is the only station with platform screen doors (supplied by Horton Automatics). Bukit Panjang and Choa Chu Kang have half-height platform barriers. Choa Chu Kang station will have two additional platforms and a new set of fare gates to ease crowding during peak hours. Between 2016 and 2017, Half-Height Platform Barriers were installed at the remaining 11 LRT stations.
As of April 2017, the Half-Height Platform Barriers were installed at all stations except for Ten Mile Junction.
Number | Name | Image | Interchange/notes |
BP1 NS4 | Choa Chu Kang | Interchange with the North South line Terminus for Services A & B |
|
BP2 | South View | ||
BP3 | Keat Hong | ||
BP4 | Teck Whye | ||
BP5 | Phoenix | ||
BP6 DT1 | Bukit Panjang | Interchange with the Downtown line Service A & B bound for Choa Chu Kang Service C bound for Ten Mile Junction |
|
BP7 | Petir | ||
BP8 | Pending | ||
BP9 | Bangkit | ||
BP10 | Fajar | ||
BP11 | Segar | ||
BP12 | Jelapang | ||
BP13 | Senja | ||
BP14 | Ten Mile Junction | Service C terminus |